May 2020 Monthly Bulletin Print
Tuesday, 16 June 2020 15:03

The 2019/2020 hydrological year which started in June 2019 in the Niger River Basin ended in this month of May 2020 with the low flow water observed over the entire Niger River basin. The flows were supported by the releases from the Sélingué dams in Mali and Kainji dams in Nigeria, the base flow and gradual onset of rainy season.
The data used for the various analyses below came from Hydrological observation networks of the National Hydrological Services and Dam Authorities of nine (9) member countries.
The flow analysis situation was carried out by dividing the basin into four sub-catchments also represented with reference gauging stations as follows: Upper Niger at Koulikoro (Mali), Inland Delta at Dire (Mali), Middle Niger in Niamey (Niger) and Lower Niger at Lokoja (Nigeria)

Download the May 2020 Monthy Bulletin